Skip to main content

Inspection visit

Routine inspection

Clean visit · 0 citations

Inspector’s narrative

What the inspector wrote

On 4/25/2023 starting at 1:10 PM, Licensing Program Analyst (LPA) L. Fici arrived unannounced to conduct 1-Year Annual Required Inspection. LPA met with Joy Dela Cueva, Administrator (ADM) and explained the purpose of the visit. Administrators certificate is valid and expires on 6/25/2024. The facility’s fire clearance was approved for all six (6) non- ambulatory residents, of which (1) may be Bedridden and hospice waiver for three (3) residents. Upon entry, LPA observed two (2) staff and four (4) residents present during inspection. Starting at 1:35 PM, LPA toured facility with ADM including but not limited to five (5) bedrooms, two (2) bathrooms, kitchen, common area and backyard. The facility consists of 5 total bedrooms which all 5 bedrooms are private. All outdoor and indoor passageways are kept free of obstruction. There are no bodies of water observed. A comfortable temperature is maintained at 75 Degrees Fahrenheit. LPA observed lighting in all rooms are adequate for the comfort and safety of the residents'. The hot water temperature in residents ’ common area bathroom was measured at 110.7 Degrees Fahrenheit. Residents’ bathrooms are equipped non-skid mats. There is a minimum of one-week supply of nonperishables and 2-day supple of perishable foods. Sharps and toxins were locked and inaccessible to residents'. Smoke detectors and carbon monoxide detector were in operating condition. Fire extinguisher was observed last serviced on 8/15/2022. First aid kit was observed to be complete. Continue on Lic809-C Continue from Lic809 Starting at 2:13 PM, LPA reviewed 3 of 3 staff records. At 2:45 PM, LPA reviewed 4 of 4 residents' records which are current. At 3:17 PM, LPA reviewed a sample of 4 of 4 residents' medications. Updated copies of the following documents were requested for facility file and are to be submitted to CCL by 5/2/2023: · LIC 308 Designation of Administrative Responsibility · LIC 500 Personnel Report · LIC 610E Emergency Disaster Plan (9 Pages) · Liability Insurance No deficiencies cited during visit. Exit interview conducted with ADM, and a copy of this report provided.

Citations

No citations recorded on this visit

The inspector found no violations of California child care regulations during this visit.

FAQ · About this visit

Common questions about this visit

What happened during the April 25, 2023 inspection of PLEASANT HILL VILLA HOME CARE 3?

This was a inspection inspection of PLEASANT HILL VILLA HOME CARE 3 on April 25, 2023. The inspection found no deficiencies and no citations were issued.

Were any citations issued to PLEASANT HILL VILLA HOME CARE 3 on April 25, 2023?

No citations were issued during this inspection. The facility was found to be in compliance with all applicable regulations.

What type of inspection was this?

This was a inspection inspection. inspection inspections are conducted by CCLD as part of their licensing oversight.

SourceView on CCLDView original report

Share this reportEmail

Next steps

If this is your facility,claim this pageand correct anything the record gets wrong. Free.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CCLD public records. Last updated . If you believe any information is inaccurate, report it here.