CASA DEL SOL II RESIDENCELicense 198602191
Clean visit · 0 citations

Inspector’s narrative

What the inspector wrote

Licensing Program Analyst (LPA) Pamela Bunker conducted an unannounced required 1- year visit with the primary focus on Infection Control measures and using the new CARE Inspection Tool. Upon arrival at the facility, LPA Bunker conducted a risk assessment. Based on the assessment, the facility is clear of COVID-19 infection. LPA was properly screened for COVID-19 symptoms and temperature was checked. LPA Bunker met staff member LVN Vida Zelaya and explained the purpose of today's Annual Inspection. LPA verified that the facility has an approved mitigation plan report. There are currently five (5), residents in placement. The facility's annual fees are current. Staff member Ms. Vida and LPA Bunker toured the facility. The facility is a two-story building located in a residential-commercial neighborhood with, a dining room, 3 bedrooms, 3 bathrooms, and an indoor/outdoor activity area. Bedrooms #1-3 are designated as the client's bedrooms. The residents' bedrooms had the required furniture, bed linens, and closet/drawer space to accommodate them comfortably. Resident bathrooms were checked. The toilets and water faucets worked properly, the grab bars were secure, the shower was free of mold/mildew and a non-skid mat was in place. Resident bath towels, toiletries, and personal hygiene supplies were adequately stocked. Common areas were clean and clear of hazards; doorways were free of obstructions. Food and meals are prepared in the main kitchen located in the skilled nursing facility and are brought to the residents on carts. All cleaning solutions, hazardous items, and medications were securely locked and inaccessible to residents. Smoke detectors were working properly, and the fire extinguisher was fully charged. During the visit, LPA observed the facility's infection control practices. LPA observed a screening station with sanitizer at the facility entrance and additional sanitation supplies in the nursing office that were inaccessible to the residents. LPA observed a sign-in sheet and temperature log for visitors. LPA's temperature was checked during the visit. LPA observed staff wearing masks. Each resident has their own individual room for isolation and required postings are throughout the facility. Due to time constraints, LPA was unable to complete the visit and will return back at a later date to complete the visit.

Citations

No citations recorded on this visit

The inspector found no violations of California child care regulations during this visit.

FAQ · About this visit

Common questions about this visit

What happened during the September 11, 2024 inspection of CASA DEL SOL II RESIDENCE?

This was a inspection inspection of CASA DEL SOL II RESIDENCE on September 11, 2024. The inspection found no deficiencies and no citations were issued.

Were any citations issued to CASA DEL SOL II RESIDENCE on September 11, 2024?

No citations were issued during this inspection. The facility was found to be in compliance with all applicable regulations.

What type of inspection was this?

This was a inspection inspection. inspection inspections are conducted by CCLD as part of their licensing oversight.

SourceView on CCLDView original report

Share this reportEmail

Next steps

If this is your facility,claim this pageand correct anything the record gets wrong. Free.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CCLD public records. Last updated . If you believe any information is inaccurate, report it here.