Skip to main content

Inspection visit

Facility-requested visit

CRYSTAL GARDEN RCFELicense 366426126
Clean visit · 0 citations

Inspector’s narrative

What the inspector wrote

On April 6, 2023 at 10:44 a.m., Licensing Program Analyst (LPA) Rayshaun Nickolas conducted an announced case management visit. The purpose for this case management visit is to approve the facility's request for a change of capacity. LPA met with Licensee Kamal Ebadpour who assisted LPA Nickolas with conducting a facility tour. Per the LIC200, the licensee submitted a total capacity increase from eight (8) non-ambulatory to (10) non-ambulatory, specifically increasing the amount of bedridden from six (6) to eight (8) on July 21, 2022. A representative from the Apple Valley Fire Department conducted a fire safety inspection on March 21, 2023, and approved the change in status. During today’s visit, LPA Nickolas toured the interior/exterior of the building and visually inspected the resident bedrooms and bathrooms. LPA Nickolas observed that bedrooms #1, #2, #3, # 4, and #5 have exits doors with ramps that access the outside of the facility. LPA Nickolas confirmed that all identified shared rooms are large enough to accommodate the required furniture for clients without inhibiting movement into and throughout the rooms. LPA Nickolas additionally confirmed that there are sufficient bathrooms in the facility to meet Title 22 requirements for ratio of clients to bathrooms. The physical plant is ready for the capacity increase. LPA Nickolas has notified the Licensee of final capacity increase approval. LPA Nickolas further advised the Licensee that the new license will follow in the mail after capacity increase visit. No deficiencies were cited during this visit. An exit interview was conducted where this report was discussed and a copy of this report will be emailed to Ebadpour due to technical difficulties.

Citations

No citations recorded on this visit

The inspector found no violations of California child care regulations during this visit.

FAQ · About this visit

Common questions about this visit

What happened during the April 6, 2023 inspection of CRYSTAL GARDEN RCFE?

This was a other inspection of CRYSTAL GARDEN RCFE on April 6, 2023. The inspection found no deficiencies and no citations were issued.

Were any citations issued to CRYSTAL GARDEN RCFE on April 6, 2023?

No citations were issued during this inspection. The facility was found to be in compliance with all applicable regulations.

What type of inspection was this?

This was a other inspection. other inspections are conducted by CCLD as part of their licensing oversight.

SourceView on CCLDView original report

Share this reportEmail

Next steps

If this is your facility,claim this pageand correct anything the record gets wrong. Free.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CCLD public records. Last updated . If you believe any information is inaccurate, report it here.