Inspector’s narrative

What the inspector wrote

Licensing Program Analyst (LPA) Marisela Garcia-Centeno conducted an announced licensing inspection to observe the facility’s physical plant for compliance with Title 22, Division 6 of the California Code of Regulations and California Health & Safety Code. LPA was greeted at the front entrance by the Administrator, Abigail Ventura, and was granted entry after identifying herself and disclosing the purpose of their visit. The facility’s licensee is under the name The Golden Investment Adventure, LLC. The applicant applied for approval to have one (1) bedridden resident under care. The fire clearance was approved on January 8, 2025, and reflected that the facility was approved for a residential facility for the elderly 60 and over. Maximum capacity six (6) non-ambulatory residents of which one (1) resident may be bedridden in master bedroom only. In addition, the facility has hospice waiver for two (2) residents. The facility sketch was consistent with the current layout of the facility. During today’s visit, LPA accompanied by Administrator, Ventura, conducted an overall inspection of the internal and external areas of the facility. LPA discussed continuing operation requirements, record keeping, reporting requirements, and physical plant compliance with the applicant. The items reviewed were compliant with Title 22, Division 6 of the California Code of Regulations and California Health & Safety Code. No violations were observed during today’s visit. continue at LIC809C Continued from LIC809 The inspection was completed during today’s visit. The applicant was advised that the facility is ready for licensure for a maximum capacity of six (6) non-ambulatory residents of which one (1) resident may be bedridden in the designated room (master bedroom) per fire clearance approved on 1/8/2025. LPA indicated that the inspection report will be submitted for management's final review and approval. An exit interview was conducted with Administrator, Ventura, to whom a copy of this report along with the licensee Appeal Rights were provided at the conclusion of the visit to Licensee, Ronald Andres, via email at RONSEGA@GMAIL.COM. The signature below confirms receipt of these documents.

Citations

No citations recorded on this visit

The inspector found no violations of California child care regulations during this visit.

FAQ · About this visit

Common questions about this visit

What happened during the March 6, 2025 inspection of GOLDEN HEART HOME CARE?

This was an other inspection of GOLDEN HEART HOME CARE on March 6, 2025. The inspection found no deficiencies and no citations were issued.

Were any citations issued to GOLDEN HEART HOME CARE on March 6, 2025?

No citations were issued during this inspection. The facility was found to be in compliance with all applicable regulations.

What type of inspection was this?

This was an other inspection. other inspections are conducted by CCLD as part of their licensing oversight.

Share this reportEmail

Next steps

If this is your facility,claim this pageand correct anything the record gets wrong. Free.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CCLD public records. Last updated . If you believe any information is inaccurate, report it here.