Skip to main content

Inspection visit

Routine inspection

VARENNA AT FOUNTAINGROVELicense 496803049
Clean visit · 0 citations

Inspector’s narrative

What the inspector wrote

Licensing Program Analyst(LPA), Dina Alviso conducted a Required- 1 Year inspection, and met with Administrator, Ferdinand Bout, Assistant Debbie Smith, and Dan Ferrarese , Maintenance Director. The inspection is focused on the Infection Control procedures and practices of this facility. The facility is a licensed continuing care retirement community, which consists of residential assisted living residents that are provided care services, and residents that are currently independent, no provided assisted living care needs, at this time. If independent residents need care services at any time, these services may be added per the admission agreement, and the facility's plan of operation. LPA toured the main facility building with the Administrator Ferdinand Bout and Dan The facility has a large supply of personal protective equipment (PPE). The LPA observed the front lobby entrance where the screening check is conducted; There is a thermometer video scanner, hand sanitizer for use, and the Concierge will ask the screening questions and log the information as required. LPA was screened before being allowed to remain in the facility. LPA observed during the inspection, the Administrator and all other staff all wearing masks as required. Fire extinguishers were serviced and tagged as required- dated 4/18/21. The fire clearance is approved for Villetta building-132 non-ambulatory, includes 8 bedridden. Third floor 72 ambulatory, Casitas #1 thru #27, 54 non-ambulatory, and NO & SO buildings-64 non-ambulatory. Hospice granted for five (5) residents. LPA observed the food supply, perishable and non-perishable, to be sufficient during the inspection. The facility has a sufficient supply of food and water for the 72 hour shelter in place supplies. The facility has 14 large bins that contain required emergency supplies, and these are stored as follows: Main building has seven (7) bins on different floors, The South building has three (3) bins, one on each floor, and the North building has two(2) bins, one on each floor, and South and North Casita's each have one bin for each Casita area. LPA will return at a later date, to continue this inspection. No deficiencies. No citations. Exit interview conducted with Administrator Ferdinand Buot..

Citations

No citations recorded on this visit

The inspector found no violations of California child care regulations during this visit.

FAQ · About this visit

Common questions about this visit

What happened during the March 29, 2022 inspection of VARENNA AT FOUNTAINGROVE?

This was an inspection of VARENNA AT FOUNTAINGROVE on March 29, 2022. The inspection found no deficiencies and no citations were issued.

Were any citations issued to VARENNA AT FOUNTAINGROVE on March 29, 2022?

No citations were issued during this inspection. The facility was found to be in compliance with all applicable regulations.

What type of inspection was this?

This was an inspection. Inspections are conducted by CCLD as part of their licensing oversight.

Share this reportEmail

Next steps

If this is your facility,claim this pageand correct anything the record gets wrong. Free.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CCLD public records. Last updated . If you believe any information is inaccurate, report it here.