Skip to main content

Inspection visit

Routine inspection

RINCON VALLEY GARDENS ILicense 496803064
Clean visit · 0 citations

Inspector’s narrative

What the inspector wrote

Licensing Program Analyst (LPA) Christi Coppo and LPA Stefanie Mutialu arrived unannounced to conduct a required Annual inspection and was greeted by Administrator Lot Santos. Facility contact information was reviewed. At approximately 9:30am LPA and Admin toured the building and grounds. The facility was found to be clean and at a comfortable temperature. LPA observed at least a 2 day supply of perishable and 7 day supply of non-perishable food. Food was found to be stored in a safe manner with open items covered. Kitchen drawer with sharp knives locked. All bedrooms were equipped with lighting, night stand, and chest of drawers. All bedrooms were clean and in good repair. Extra hygiene products and linens were available. Resident bathroom had required bath mat and grab bar. Water temperature in sink accessible to residents in care measured at 106.2 degrees F which is within the allowable range of 105 to 120 degrees F. Fire extinguishers were last inspected 8/17/23. Smoke/Carbon Monoxide detectors located throughout the facility were tested and operational. Facility’s last quarterly disaster drills were conducted on April 5, 2024. Facility has a backup generator for use during a power outage. LPA observed storage room in garage converted to an actual bedroom for staff. Admin provided copy of building permit from City of Santa Rosa. Permit #B19-2414 issued on 5/9/2019 for residential addition alteration. Building plans for conversion of garage storage room also provided. Admin explained that they physically brought updated facility sketch to CCL RO in 2019 along with copy of building permit, in order to notify CCL of garage conversion and initiate an updated fire clearance. Per LPA record review, updated facility sketch not in CCL facility file, most recent facility sketch date stamped 4/25/2013. Facility will submit updated sketch to CCL no later than 4/15/2024. CCL will follow up with request for fire clearance and then follow up with facility once STD850 is received. Continued on 809C... Continued from 809... At approximately 11:30am LPA conducted a review of five [5] resident records. All required documentation present. At approximately 12:30pm LPA conducted review of four [4] staff records. All required documentation present. Lot Santos Administrator Certificate 7024203740 expires 1/14/2025. All fees are current as of this time. LPA and Administrator discussed facility's Infection Control Plan and Emergency Disaster plan. No new updates. No deficiencies cited during this inspection. Exit interview conducted with Administrator and a copy of this report was given.

Citations

No citations recorded on this visit

The inspector found no violations of California child care regulations during this visit.

FAQ · About this visit

Common questions about this visit

What happened during the April 11, 2024 inspection of RINCON VALLEY GARDENS I?

This was an inspection of RINCON VALLEY GARDENS I on April 11, 2024. The inspection found no deficiencies and no citations were issued.

Were any citations issued to RINCON VALLEY GARDENS I on April 11, 2024?

No citations were issued during this inspection. The facility was found to be in compliance with all applicable regulations.

What type of inspection was this?

This was an inspection. Inspections are conducted by CCLD as part of their licensing oversight.

Share this reportEmail

Next steps

If this is your facility,claim this pageand correct anything the record gets wrong. Free.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CCLD public records. Last updated . If you believe any information is inaccurate, report it here.