Skip to main content

Inspection visit

Pre-licensing visit

GLEN PARK AT OJAILicense 565850221
Clean visit · 0 citations

Inspector’s narrative

What the inspector wrote

Licensing Program Analyst (LPA) JoAnn Rosales made a Pre-licensing visit to the facility. LPA met with Administrator/Applicant Representative Tillman Pink, Jr and Assistant Administrator Maria Roth. This application is a change of ownership from At Home in Ojai #565801458. Component III was conducted in conjunction with this pre-licensing visit. LPA inspected facility for Fire Safety, Personal Accommodations and Services, Medication Procedures, and Food Service. First-aid kit is complete, facility has adequate linen, water and nonperishable food supplies. Facility has 1 private and 17 shared rooms, 3 shared and 15 private bathrooms on the 1st floor, 6 shared rooms, 2 shared and 2 private bathrooms on the 2nd floor. Signal system was tested and operable. The common areas were appropriately furnished and lighting was adequate. There is additional entertainment equipment and games for activities. Medications and resident records will be kept in a locked cabinet in the office. Staff records will be kept in a locked cabinet in the office. Hot water temperature tested at 115.9 and 118.8 degrees Fahrenheit in resident bathrooms during today’s visit. LPA observed smoke detectors and carbon monoxide detectors operating properly and fire extinguishers properly charged. Fire clearance is approved for 48 non-ambulatory of which 8 may be bedridden in bedrooms #E10, E11, E12 and E13. The following needs to be completed/proof submitted prior to the facility being licensed: 1. Updated facility sketch consistent with physical plant. Exit interview conducted, today's report was reviewed and emailed to the Administrator.

Citations

No citations recorded on this visit

The inspector found no violations of California child care regulations during this visit.

FAQ · About this visit

Common questions about this visit

What happened during the September 30, 2021 inspection of GLEN PARK AT OJAI?

This was a other inspection of GLEN PARK AT OJAI on September 30, 2021. The inspection found no deficiencies and no citations were issued.

Were any citations issued to GLEN PARK AT OJAI on September 30, 2021?

No citations were issued during this inspection. The facility was found to be in compliance with all applicable regulations.

What type of inspection was this?

This was a other inspection. other inspections are conducted by CCLD as part of their licensing oversight.

SourceView on CCLDView original report

Share this reportEmail

Next steps

If this is your facility,claim this pageand correct anything the record gets wrong. Free.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CCLD public records. Last updated . If you believe any information is inaccurate, report it here.