Skip to main content

Inspection visit

Fire Safety inspection

LAKEWOOD POST ACUTE AND REHABILITATIONCMS #06540011 citations on this visit
11 citations recorded

Citations

11 citations recorded*CMS

This is a Fire Safety survey. CMS cites these findings under the Life Safety Code and Emergency Preparedness rules, a separate set from the health (F-tag) deficiencies. The codes and grading differ, so these do not link to the health violation pages.

What do CMS severity letters mean?

Serious (G-L). Actual harm to a resident, or immediate jeopardy. Codes G through I indicate actual harm; J through L indicate immediate jeopardy to resident health or safety.

General (A-F). No actual harm found, or harm that is minimal. The facility must still submit a Plan of Correction. Most CMS citations land here.

Each letter combines severity with scope: how many residents the deficiency affected.

  • 0211GeneralS&S Dpotential for harm

    Keep aisles, corridors, and exits free of obstruction in case of emergency.

  • 0291GeneralS&S Fpotential for harm

    Install emergency lighting that can last at least 1 1/2 hours.

  • 0345GeneralS&S Fpotential for harm

    Have approved installation, maintenance and testing program for fire alarm systems.

  • 0321GeneralS&S Dpotential for harm

    Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.

  • 0353GeneralS&S Dpotential for harm

    Inspect, test, and maintain automatic sprinkler systems.

  • 0363GeneralS&S Fpotential for harm

    Install corridor and hallway doors that block smoke.

  • 0521GeneralS&S Fpotential for harm

    Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.

  • 0712GeneralS&S Fpotential for harm

    Have simulated fire drills held at unexpected times.

  • 0751GeneralS&S Dpotential for harm

    Have restrictions on the use of flammable curtains.

  • 0911GeneralS&S Dpotential for harm

    Meet requirements for the installation and maintenance of electrical systems.

  • 0918GeneralS&S Fpotential for harm

    Have generator or other power source capable of supplying service within 10 seconds.

FAQ · About this visit

Common questions about this visit

What happened during the February 25, 2020 survey of LAKEWOOD POST ACUTE AND REHABILITATION?

This was a inspection survey of LAKEWOOD POST ACUTE AND REHABILITATION on February 25, 2020. The surveyor cited 11 deficiencies, recorded on the federal Form 2567 statement of deficiencies.

Were any deficiencies cited at LAKEWOOD POST ACUTE AND REHABILITATION on February 25, 2020?

Yes, 11 deficiencies were cited, each with a CMS Scope and Severity grade. The first was: "Keep aisles, corridors, and exits free of obstruction in case of emergency."

What type of survey was this?

This was a inspection survey conducted by state surveyors under federal Centers for Medicare & Medicaid Services (CMS) oversight. Findings are published on CMS Care Compare.

Share this reportEmail

Next steps

Concerned about a resident’s care?Find your local ombudsman through the Eldercare Locatoror file a complaint with your state survey agency.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CMS Care Compare public records. Dataset last refreshed . If you believe any information is inaccurate, report it here.