05/28/2025 106065
ISLE HEALTHCARE & REHABILITATION CENTER 1125 FLEMING PLANTATION BLVD., ORANGE PARK, Florida, 32003
CROSS-REFERENCED TO THE APPROPRIATE DEFICIENCY)
K0000 INITIAL COMMENTS K0000 An unannounced recertification survey was conducted on May 28, 2025 at Isle Healthcare and Rehabilitation Center, a nursing home in Orange Park, Florida.
Isle Healthcare and Rehabilitation Center is not in compliance with 42 CFR 483.90 (a) & (b), and National Fire Protection Association (NFPA) 101 (2012 Edition), and Tentative Interim Amendments (TIAs) 12-1, 12-2, 12-3, and 12-4. NFPA 99 (2012 Edition) and Tentative Interim Amendments (TIAs) 12-2, 12-3, 12-4, 12-5, and 12-6, requirements for nursing homes.
The following is a description of the noncompliance: Initial Plan Review: 2003 New or Existing: Existing NFPA 220 Construction Type: II (000) Fully Sprinkled Monitored Fire Alarm Footage: 57,000 Generator: 300 kw Number of beds: 108 Census: 98
1125 FLEMING PLANTATION BLVD, ORANGE PARK, Florida, 32003 |
K0000
K0293 SS = D
Exit Signage CFR(s): NFPA 101 Exit Signage 2012 EXISTING Exit and directional signs are displayed in accordance with 7.10 with continuous illumination also served by the emergency lighting system. 19.2.10.1 (Indicate N/A in one-story existing occupancies with less than 30 occupants where the line of exit travel is obvious.) This STANDARD is NOT MET as evidenced by:
Based on observations and staff interview, the facility failed to provide an exit sign to show the proper means of egress from the facility's courtyard in accordance with NFPA 101 (2012).
The findings include:
During the facility tour with the Maintenance Director on 5/28/25 from 1:00 PM to 3:45 PM, an exit sign was observed to be missing from the courtyard to the closest emergency exit.
During an interview with the Maintenance Director on 5/28/25 at 2:30 PM, he acknowledged the missing exit sign and stated, "I never noticed. We have one on the other side of the courtyard."
per: NFPA 101 (2012 Edition) 7.10.1.2., 7.10.1.5.1., 19.2.10.1.
These findings were verified by the Maintenance Director at the times of observation and the Administrator at the exit conference on 5/28/25 at 4:00 PM.
K0000
K0293
(a) What corrective action(s) will be accomplished for those residents found to have been affected by the practice:
The EXIT light for egress from courtyard was installed on 6/13/25 by the maintenance staff.
(b) How you will identify other residents having potential to be affected by the same practice and what corrective action will be taken:
On 6/13/25, the Executive Director/designee conducted an audit of all paths of egress to ensure that appropriate EXIT signage is in place. No other areas were out of compliance.
(c) What measures will be put into place or what systematic changes you will make to ensure that the practice does not recur:
On 6/17/25, the Plant Operations Life safety consultant-educated the Maintenance Department/Administrator on the components of this regulation with emphasis on ensuring paths of egress are appropriately identified with illuminated EXIT sins and are routinely inspected.
Any newly hired maintenance staff will be educated on these components during orientation as well.
(d) How the corrective action(s) will be monitored to ensure the practice will not recur, i.e., what quality assurance program will be put into place:
The monitoring of this tag will be a joint effort between the NHA and the Maintenance Director as they will make weekly walking rounds for the next four weeks and bi-monthly for 2 months as they review means of
06/29/2025
ISLE HEALTHCARE & REHABILITATION CENTER 1125 FLEMING PLANTATION BLVD., ORANGE PARK, Florida, 32003
K0293 SS = D Continued from page 2 egress paths are not obstructed and identified appropriately with illuminated EXIT signage. A report on their findings will be discussed at the monthly Risk Management/QA meeting to determine when compliance has been met and quarterly monitoring by the Director of Plant Operations/Designe is recommended.
K0293 Continued from page 2 egress paths are not obstructed and identified appropriately with illuminated EXIT signage. A report on their findings will be discussed at the monthly Risk Management/QA meeting to determine when compliance has been met and quarterly monitoring by the Director of Plant Operations/Designe is recommended.
K0321 SS = D Hazardous Areas - Enclosure CFR(s): NFPA 101 Hazardous Areas - Enclosure Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door. Describe the floor and zone locations of hazardous areas that are deficient in REMARKS. 19.3.2.1, 19.3.5.9 Area Automatic Sprinkler Separation N/A a. Boiler and Fuel-Fired Heater Rooms b. Laundries (larger than 100 square feet) c. Repair, Maintenance, and Paint Shops d. Soiled Linen Rooms (exceeding 64 gallons) e. Trash Collection Rooms (exceeding 64 gallons) f. Combustible Storage Rooms/Spaces (over 50 square feet) g. Laboratories (if classified as Severe Hazard - see k322) This STANDARD is NOT MET as evidenced by:
K0321 (a) What corrective action(s) will be accomplished for those residents found to have been affected by the practice: Door closers were installed/adjusted by the maintenance staff on 6/17/25 for: 1. 200 hall shower room 2. Vacuum pump room (b) How you will identify other residents having potential to be affected by the same practice and what corrective action will be taken: On 6/17/25, the Executive Director/designee completed an audit of rooms with doors that may need closers. No other doors were found to need closers. (c) What measures will be put into place or what systematic changes you will make to ensure that the practice does not recur: On 6/17/25, the Plant Operations Life safety consultant re-educated the Maintenance/Administrator Staff on the components of this regulation with emphasis on ensuring self-closers are present on doors requiring them. Newly hired maintenance staff will be educated on these components during orientation as well. (d) How the corrective action(s) will be monitored to 06/29/2025
|---|---|---|---|
ISLE HEALTHCARE & REHABILITATION CENTER
1125 FLEMING PLANTATION BLVD., ORANGE PARK, Florida, 32003
|---|---|---|---|---| | K0321 SS = D | Continued from page 3 Based on observation and staff interview, the facility failed to maintain hazardous areas in accordance with NFPA 101 (2012). The findings include: During a tour of the facility with the Maintenance Director on 5/28/25 from 1:00 PM to 3:45 PM in the old vacuum pump room and Hall 200/shower room, it was observed that the rooms were converted into storage areas and the door was missing a self-closing device. Hazardous area doors shall be self-closing or automatic-closing. per: NFPA 101 (2012 Edition) 19.3.2.1.3. During an interview with the Maintenance Director on 5/28/25 at 3:00 PM, he acknowledged that the facility failed to install a self-closing device on the door and stated, "I'll take care of this as soon as I can." These findings were verified by the Maintenance Director at the times of observations and the Administrator at the exit conference on 5/28/25 at 4:00 PM | K0321 | Continued from page 3 ensure the practice will not recur, i.e., what quality assurance program will be put into place: The monitoring of this tag will be a joint effort between the NHA and the Maintenance Director as they will make weekly walking rounds for the next four weeks and bi-monthly for 2 months as they review the facility doors to ensure doors requiring self-closers have them in place and functioning. A report on their findings will be discussed at the monthly Risk Management/QA meeting to determine when compliance has been met and quarterly monitoring by the Director of Plant Operations/Designee is recommended. | |
106065 05/28/2025
ISLE HEALTHCARE & REHABILITATION CENTER 1125 FLEMING PLANTATION BLVD., ORANGE PARK, Florida, 32003
PREFIX TAG ID PREFIX TAG CROSS-REFERENCED TO THE APPROPRIATE DEFICIENCY) COMPLETION DATE
K0711 SS = D Continued from page 4 19.7.2.2, 19.7.2.3 This STANDARD IS NOT MET as evidenced by:
Based on record review and staff interview, the facility failed to provide emergency preparedness training to all staff members in accordance with NFPA 101 (2012). The findings include: During record review with the Maintenance Director on 5/28/25 at 11:10 AM, the documentation provided for both internal and external-disaster drills revealed that not all staff members had been trained. The training roster noted that only 44 of the facility’s 172 employees had been trained. Employees are to be periodically instructed and kept informed of their duties under the plan. During an interview with the Maintenance Director on 5/8/25 at 11:15 AM, he acknowledged that all staff members had not received emergency preparedness training. He had no further comment. per: NFPA 101 (2012 Edition) 19.7.1.2, 19.7.2.3.1. These findings were verified by the Maintenance Director at the time of record review and the Administrator at the exit conference on 5/28/25 at 4:00 PM.
K0711 Continued from page 4 potential to be affected by the same practice and what corrective action will be taken: On 6/16/25 an audit for all training related to emergency preparedness and the execution of emergency exercises and event management was conducted by the. Director Maintenance-Isle. No other non-compliant training deficiencies were discovered. (c) What measures will be put into place or what systematic changes you will make to ensure that the practice does not recur: On 6/17/25, the Plant Operations life safety consultant provided education to the Executive Director and Maintenance Director on the components of this regulation with emphasis on ensuring internal and external disaster drills should be conducted with staff participation and awareness on a semi-annual basis. (d) How the corrective action(s) will be monitored to ensure the practice will not recur, i.e., what quality assurance program will be put into place: The Executive Director/Designee will monitor monthly for compliance and report findings at the monthly Risk Management/QA Committee and recommends on-going monitoring by the Plant Operations life safety consultant /designee when conducting facility visits and quality systems reviews.
K0920 SS = D Bldg.-01 Electrical Equipment - Power Cords and Extens CFR(s): NFPA 101 Electrical Equipment - Power Cords and Extension Cords Power strips in a patient care vicinity are only used for components of movable patient-care-related electrical equipment (PCREE) assemblies that have been assembled by qualified personnel and meet the conditions of 10.2.3.6. Power strips in the patient care vicinity are not to be used for non-PCREE (e.g., personal electronics), except in long-term care resident rooms that do not use PCREE. Power strips for
K0920 Preparation and/or execution of this plan does not constitute admission or agreement by the provider of the truth of the facts alleged or conclusions set forth correction is prepared and/or executed solely because required. (a) What corrective action(s) will be accomplished for those residents found to have been affected by the practice: On 5/30/25 the RPTs were removed from the IT room. A
|---|---|---|---|
K0920 SS = D Bldg. 01
Continued from page 5 PCREE meet UL 1363A or UL 60601-1. Power strips for non-PCREE in the patient care rooms (outside of vicinity) meet UL 1363. In non-patient care rooms, power strips meet other UL standards. All power strips are used with general precautions. Extension cords are not used as a substitute for fixed wiring of a structure. Extension cords used temporarily are removed immediately upon completion of the purpose for which it was installed and meets the conditions of 10.2.4.
10.2.3.6 (NFPA 99), 10.2.4 (NFPA 99), 400-8 (NFPA 70), 590.3(D) (NFPA 70), TIA 12-5
This STANDARD is NOT MET as evidenced by:
Based on observation and staff interview, the facility failed to maintain power strips and extension cords in accordance with NFPA 101 (2012).
The findings include:
During the facility tour with the Maintenance Director on 5/28/25 from 1:00 PM to 3:45 PM in the data closet, power strips were observed being used as a substitute for the fixed wiring.
During an interview with the Maintenance Director on 5/28/25 at 3:00 PM, he acknowledged that the power strips were used incorrectly and stated the facility would contact the IT (information technology) personnel to have the power strips removed.
per: NFPA 101 (2012 Edition) 19.5.1.1., 9.1.2.
per: NFPA 70 (2011 Edition) 400.8 ( 1 )
These findings were verified by the Maintenance Director at the time of observation and the Administrator at the exit conference on 5/28/25 at 4:00 PM.
K0920
Continued from page 5
UPS (APC BE600M1) was installed on the same day by the maintenance staff.
(b) How you will identify other residents having potential to be affected by the same practice and what corrective action will be taken:
On 5/30/25, areas in the facility were inspected/audited for improper installation/use of plug strip/extension cord s by the Maintenance Director to identify other residents having the potential to be affected. No other areas of concern were identified during this audit.
(c) What measures will be put into place or what systematic changes you will make to ensure that the practice does not recur:
Education conducted on 6/17/25, by Plant Operations life safety consultant with the Executive Director and Maintenance Director on the components of this regulation with emphasis on ensuring power strips are not used as a permanent power source where applicable. New plant operations staff will be educated on this regulation during the new employee orientation.
(d) How the corrective action(s) will be monitored to ensure the practice will not recur, i.e., what quality assurance program will be put into place.
The monitoring of this tag will be a joint effort between the NHA and the Maintenance Director as they will conduct a monthly review of all the facility to ensure proper use of plug strips/extension cords per NFPA guidelines. A report on their findings will be discussed at the monthly Risk Management/QA meeting to determine when compliance has been met and quarterly monitoring by the Director of Plant Operations/Designee.
ISLE HEALTHCARE & REHABILITATION CENTER 1125 FLEMING PLANTATION BLVD., ORANGE PARK, Florida, 32003
PREFIX TAG ID PREFIX TAG COMPLETION DATE
E0000 Initial Comments
E0000
During the recertification survey conducted on May 28, 2025 at Isle Healthcare and Rehabilitation Center, a nursing home, Emergency Preparedness was reviewed.
Isle Healthcare and Rehabilitation Center is not in compliance with Emergency Preparedness per Code of Federal Regulations (CFR) 42, Part 483.73, Requirements for Long-Term Care Facilities.
The following is a description of the noncompliance:
E0042 SS = D Integrated EP Program CFR(s): 483.73(f)
§416.54(e), §418.113(e), §441.184(e), §460.84(e), §482.15(f), §483.73(f), §483.475(e), §484.102(e), §485.68(e), §485.542(f), §485.625(f), §485.727(e), §485.920(e), §486.360(f), §491.12(e), §494.62(e).
(e) [or (f)]Integrated healthcare systems. If a (facility) is part of a healthcare system consisting of multiple separately certified healthcare facilities that elects to have a unified and integrated emergency preparedness program, the (facility) may choose to participate in the healthcare system's coordinated emergency preparedness program.
If elected, the unified and integrated emergency preparedness program must: [do all of the following:]
(1) Demonstrate that each separately certified facility within the system actively participated in the development of the unified and integrated emergency preparedness program.
(2) Be developed and maintained in a manner that takes into account each separately certified facility's
E0042 06/29/2025
(a) What corrective action(s) will be accomplished for those residents found to have been affected by the practice:
The E0042 Integrated health system designation was placed in the EPP documentation on 6/17/25.
(b) How you will identify other residents having potential to be affected by the same practice and what corrective action will be taken:
On 6/17/25, the Executive Director conducted an audit of all paths of egress to ensure that appropriate Etags were identified in the EPP. No other areas were out of compliance.
(c) What measures will be put into place or what
Any deficiency statement ending in an asterisk (*) denotes the institution may be excused from correcting provided it is determined that
05/28/2025
1125 FLEMING PLANTATION BLVD., ORANGE PARK, Florida, 32003
E0042 Continued from page 1 E0042 Continued from page 1 SS = D unique circumstances, patient populations, and services offered.
(3) Demonstrate that each separately certified facility is capable of actively using the unified and integrated emergency preparedness program and is in compliance [with the program].
(4) Include a unified and integrated emergency plan that meets the requirements of paragraphs (a)(2), (3), and (4) of this section. The unified and integrated emergency plan must also be based on and include the following:
(i) A documented community-based risk assessment, utilizing an all-hazards
approach.
(ii) A documented individual facility-based risk assessment for each separately certified facility within the health system, utilizing an all-hazards approach.
(5) Include integrated policies and procedures that meet the requirements set forth in paragraph (b) of this section, a coordinated communication plan, and training and testing programs that meet the requirements of paragraphs (c) and (d) of this section, respectively.
This STANDARD IS NOT MET as evidenced by:
Based on record review and staff interview, the facility failed to establish whether it was part of a healthcare system consisting of multiple separately certified healthcare facilities that elected to have a unified and integrated emergency preparedness program in accordance with CFR 483.73.
The findings include:
During record review with the Administrator on 5/28/25 at 3:50 PM, the facility failed to produce documentation that showed whether the facility was part of a healthcare system consisting of multiple separately certified healthcare facilities that elected to have a unified and integrated emergency preparedness program.
systematic changes you will make to ensure that the practice does not recur.
On 6/17/25, the Plant Operations Life safety consultant-educated the Maintenance Department/Administrator on the components of this regulation with emphasis on ensuring documentation identifying ISLE as a NON-participant in an integrated health system.
Any newly hired maintenance staff will be educated on those components during orientation as well.
(d) How the corrective action(s) will be monitored to ensure the practice will not recur, i.e., what quality assurance program will be put into place:
The monitoring of this tag will be a joint effort between the NHA and the Maintenance Director as they will make weekly walking rounds for the next four weeks and bi-monthly for 2 months as they review to ensure appropriate documentation is maintained in the EPP A report on their findings will be discussed at the monthly Risk Management/QA meeting to determine when compliance has been met and quarterly monitoring by the Director of Plant Operations/Designee is recommended.
ISLE HEALTHCARE & REHABILITATION CENTER
1125 FLEMING PLANTATION BLVD., ORANGE PARK, Florida, 32003
E0042 SS = D
Continued from page 2
During an interview with the Administrator on 5/28/25 at 3:55 PM, he acknowledged that the facility had not established whether it was part of a healthcare system consisting of multiple separately certified healthcare facilities and stated, "I was unaware of this requirement."
per: CFR 483.73
.
E0042