SUMMARY OF DEFICIENCIES ID PLAN OF CORRECTION 106102 10/23/2024 SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237 ID PREFIX PREFIX TAG TAG DEFICIENCY) COMPLETION DATE
K 000 INITIAL COMMENTS
K 000 An unannounced Fire & Life Safety recertification survey was conducted on 10/23/2024 at Sarasota Point Rehabilitation Center, a skilled nursing facility in Sarasota, Florida. Sarasota Point Rehabilitation Center is not in compliance with the Code of Federal Regulations (CFR) 42, Section 483.90(a)&(b), Physical Environment Requirements for Long-Term Care Facilities and the National Fire Protection Association (NFPA) 101 (2012 edition) Life Safety Code. Initial Plan Review: 1976 Existing NFPA 220 Construction Type: I (332) Number of beds: 120 Census: 96 The following is the description of the noncompliance.
K 353 Sprinkler System - Maintenance and Testing
K 353 11/24/24 SS=F CFR(s): NFPA 101 Sprinkler System - Maintenance and Testing Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available. a) Date sprinkler system last checked b) Who provided system test 11/15/2024
106102
10/23/2024
SARASOTA POINT REHABILITATION CENTER
2600 COURTLAND STREET SARASOTA, FL 34237
PREFIX TAG
ID PREFIX TAG
DEFICIENCY)
COMPLETION DATE
K 353
Continued From page 1 c) Water system supply source
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system. 9.7.5, 9.7.7, 9.7.8, and NFPA 25 This REQUIREMENT is not met as evidenced by:
Based on record review, observation and staff interview with the Maintenance Director, the facility failed to perform the required inspections of the automatic fire sprinkler system (AFSS) as required in NFPA 101.
The findings included;
On 10/23/24 between 10:00 a.m. and 11:00 a.m., during record review with the Maintenance Director, the facility failed to provide documentation of a 3rd quarter sprinkler system inspection. The previous 3rd quarter inspection was performed on 8/7/23. The Maintenance Director was interviewed, and he said he could not locate the documents. An interview was conducted with the Maintenance Director concurrent with the observations and acknowledged the findings.
per NFPA 101 (2012 Edition) 19.3.5, 9.7.5 per NFPA 25 (2011 Edition) table 5.1.1.2
K 353
1. The center will perform the required inspections of the automatic fire sprinkler system as required by NFPA 101 by 11/24/2024.
2. All residents had the potential of being affected by the missed inspection.
3. The Maintenance Supervisor was educated on 11/15/24 by the Administrator/ VPO on maintenance and testing automatic sprinkler and standpipe systems in accordance with NFPA 25.
4. The maintenance supervisor will audit the center's inspection of the automatic fire sprinkler systems in accordance with NFPA 25 and review the results with QA&A Committee after each inspection for one year, and then as directed by the QA&A Committee thereafter.
K 914 SS=F
CFR(s): NFPA 101
Electrical Systems - Maintenance and Testing
Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional
K 914
11/24/24
106102 10/23/2024
SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237
PREFIX PREFIX COMPLETION DATE
K 914 Continued From page 2 testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results. 6.3.4 (NFPA 99) This REQUIREMENT is not met as evidenced by: Based on record review and staff interview with the Maintenance Director, it was revealed that the facility failed to ensure that all Essential and standard Electrical Equipment was inspected and maintained as required. Essential and Standard Electrical Equipment not inspected, tested, and maintained renders the equipment unreliable, and undetected faulty equipment could cause the safety features of the equipment to fail and raises potential for negative outcomes to patients and building occupants. The findings included: On 10/23/24 between 10:00 a.m. and 11:00 a.m., during record review with the Maintenance Director, documentation for the Main & Feeder Circuit Breaker inspection including periodic exercise in accordance with the manufacturer's recommendations could not be produced. K 914 1. The Center's main & feeder circuit breaker inspections were completed on 4/17/24 (minor and load bank) and 11/15/24 (breaker exercising) by LEW. 2. All residents had the potential of being affected by the missed inspection. 3. The Maintenance Supervisor was educated on 11/15/24 by the Administrator/ VPO on inspecting, testing and maintaining essential and standard electrical equipment in accordance with NFPA 101. 4. The maintenance supervisor will audit the center's inspection of the essential and standard electrical equipment in accordance with NFPA 99 testing requirements and review the results with
106102
10/23/2024
SARASOTA POINT REHABILITATION CENTER
2600 COURTLAND STREET SARASOTA, FL 34237
K 914
Continued From page 3 An interview was conducted with the Maintenance Director concurrent with the observations and acknowledged the findings. Per NFPA 101 (2012 Edition) 19.5.1.1, 9.1.2 Per NFPA 110 (2010 Edition) 8.4.7
K 914
Q&A Committee for one year, and as directed by the QA&A Committee thereafter.
LIST OF DEFICIENCIES PLAN OF CORRECTION 106102 10/23/2024 SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237 PREFIX TAG ID PREFIX TAG DEFICIENCY) COMPLETION DATE
E 000 Initial Comments
E 000 During the Fire & Life Safety recertification survey that was conducted on 10/23/2024 at Sarasota Point Rehabilitation Center, a skilled nursing facility, Emergency Preparedness regulations were reviewed. Sarasota Point Rehabilitation Center is not in compliance with the Code of Federal Regulations (CFR) 42, Section 483.73, Emergency Preparedness Requirement for Long-Term Care (LTC) Facilities. The following is the description of the noncompliance.
E 039 EP Testing Requirements
E 039 11/24/24 SS=F $416.54(d)(2), $418.113(d)(2), $441.184(d)(2), $460.84(d)(2), $482.15(d)(2), $483.73(d)(2), $483.475(d)(2), $484.102(d)(2), $485.68(d)(2), $485.542(d)(2), $485.625(d)(2), $485.727(d)(2), $485.920(d)(2), $491.12(d)(2), $494.62(d)(2). *[For ASCs at $416.54, CORFs at $485.68, REHs at $485.542, OPO, "Organizations" under $485.727, CMHCs at $485.920, RHCs/FQHCs at $491.12, and ESRD Facilities at $494.62]; (2) Testing. The (facility) must conduct exercises to test the emergency plan annually. The (facility) must do all of the following: (i) Participate in a full-scale exercise that is community-based every 2 years; or (A) When a community-based exercise is not accessible, conduct a facility-based functional exercise every 2 years; or 11/15/2024
106102
10/23/2024
SARASOTA POINT REHABILITATION CENTER
2600 COURTLAND STREET SARASOTA, FL 34237
PREFIX TAG
ID PREFIX TAG
DEFICIENCY)
COMPLETION DATE
E 039
Continued From page 1
(B) If the [facility] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required community-based or individual, facility-based functional exercise following the onset of the actual event. (ii) Conduct an additional exercise at least every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [facility's] emergency plan, as needed.
*[For Hospices at 418.113(d):] (2) Testing for hospices that provide care in the patient's home. The hospice must conduct exercises to test the emergency plan at least annually. The hospice must do the following: (i) Participate in a full-scale exercise that is community based every 2 years; or (A) When a community based exercise is not accessible, conduct an individual facility based functional exercise every 2 years; or (B) If the hospice experiences a natural or
E 039
COMPLETED 10/23/2024
SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237
PREFIX TAG ID PREFIX TAG DEFICIENCY) COMPLETION DATE
E 039 Continued From page 2
E 039 man-made emergency that requires activation of the emergency plan, the hospital is exempt from engaging in its next required full scale community-based exercise or individual facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted; that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (3) Testing for hospices that provide inpatient care directly. The hospice must conduct exercises to test the emergency plan twice per year. The hospice must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual facility-based functional exercise; or (B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospice is exempt from engaging in its next required full-scale community based or facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that
106102 10/23/2024 SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237 PREFIX TAG ID PREFIX TAG DEFICIENCY) COMPLETION DATE
E 039 Continued From page 3 may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop led by a facilitator that includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the hospice's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the hospice's emergency plan, as needed. *[For PRFTs at $441.184(d), Hospitals at $482.15(d), CAHs at $485.625(d):] (2) Testing. The [PRTF, Hospital, CAH] must conduct exercises to test the emergency plan twice per year. The [PRTF, Hospital, CAH] must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or (B) If the [PRTF, Hospital, CAH] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an [additional] annual exercise or and that may include, but is not limited to the following:
E 039
106102
10/23/2024
SARASOTA POINT REHABILITATION CENTER
2600 COURTLAND STREET SARASOTA, FL 34237
PREFIX TAG
ID PREFIX TAG
DEFICIENCY)
COMPLETION DATE
E 039
Continued From page 4 (A) A second full-scale exercise that is community-based or individual, a facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the [facility's] emergency plan, as needed.
**[For PACE at §460.84(d):] (2) Testing. The PACE organization must conduct exercises to test the emergency plan at least annually. The PACE organization must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or (B) If the PACE experiences an actual natural or man-made emergency that requires activation of the emergency plan, the PACE is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted that may include, but is not limited to the following:
E 039
106102 10/23/2024
SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237
PREFIX TAG ID PREFIX TAG DEFICIENCY) COMPLETION DATE
E 039 Continued From page 5
E 039
(A) A second full-scale exercise that is community-based or individual, a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the PACE's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the PACE's emergency plan, as needed.
*{For LTC Facilities at §483.73(d):} (2) The [LTC facility] must conduct exercises to test the emergency plan at least twice per year, including unannounced staff drills using the emergency procedures. The [LTC facility, ICF/IID] must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise. (B) If the [LTC facility] facility experiences an actual natural or man-made emergency that requires activation of the emergency plan, the LTC facility is exempt from engaging its next required a full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility based functional exercise; or
106102
10/23/2024
SARASOTA POINT REHABILITATION CENTER
2600 COURTLAND STREET SARASOTA, FL 34237
PREFIX TAG
ID PREFIX TAG
DEFICIENCY)
COMPLETION DATE
E 039
Continued From page 6 (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator, includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [LTC facility] facility's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [LTC facility] facility's emergency plan, as needed.
* [For ICF/IIDs at §483.475(d)]: (2) Testing. The ICF/IID must conduct exercises to test the emergency plan at least twice per year. The ICF/IID must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or (B) If the ICF/IID experiences an actual natural or man-made emergency that requires activation of the emergency plan, the ICF/IID is exempt from engaging in its next required full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements,
E 039
10/23/2024 SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237 PREFIX TAG ID PREFIX TAG DEFICIENCY) COMPLETION DATE
E 039 Continued From page 7
E 039 directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the ICF/IID's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the ICF/IID's emergency plan, as needed.
*[For HHAs at §484.102] (d)(2) Testing. The HHA must conduct exercises to test the emergency plan at least annually. The HHA must do the following: (i) Participate in a full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise every 2 years; or. (B) If the HHA experiences an actual natural or man-made emergency that requires activation of the emergency plan, the HHA is exempt from engaging in its next required full-scale community-based or individual, facility based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared
**106102**
**10/23/2024**
**SARASOTA POINT REHABILITATION CENTER**
**2600 COURTLAND STREET** **SARASOTA, FL 34237**
PREFIX TAG
ID PREFIX TAG
DEFICIENCY)
COMPLETION DATE
E 039 Continued From page 8 questions designed to challenge an emergency plan. (iii) Analyze the HHA's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the HHA's emergency plan, as needed.
*[For OPOs at §486.360] (d)(2) Testing. The OPO must conduct exercises to test the emergency plan. The OPO must do the following: (i) Conduct a paper-based, tabletop exercise or workshop at least annually. A tabletop exercise is led by a facilitator and includes a group discussion, using a narrated, clinically relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. If the OPO experiences an actual natural or man-made emergency that requires activation of the emergency plan, the OPO is exempt from engaging in its next required testing exercise following the onset of the emergency event. (ii) Analyze the OPO's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the [RNHCIs and OPO's] emergency plan, as needed.
*[ RNHCIs at §403.748]: (d)(2) Testing. The RNHCI must conduct exercises to test the emergency plan. The RNHCI must do the following: (i) Conduct a paper-based, tabletop exercise at least annually. A tabletop exercise is a group discussion led by a facilitator, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an
E 039
106102 10/23/2024 SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237 ID PREFIX TAG PREFIX TAG COMPLETION DATE DEFICIENCY)
E 039 Continued From page 9 emergency plan. (ii) Analyze the RNHCI's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the RNHCI's emergency plan, as needed. This REQUIREMENT is not met as evidenced by:
Based on record review and staff interview with the Administrator, the facility failed to provide evidence of an External and Internal Disaster drill with a documented staff participation.
The findings included: On 10/23/24 between 3:30 p.m. and 4:30 p.m., during record review with the Administrator, documentation for the external and Internal annual drills was produced. A Hurricane drill dated 8/29/23 and a Power failure drill dated 6/30/23 was submitted for review. The facility failed to acquire signed staff participation forms for the hurricane drill. Drills for the 2024 year had not been completed. An interview conducted with the Administrator concurrent with the observations and acknowledged the findings.
Per 42 CFR 483.73(d)(2)
E 039 1. The center's required activation of its emergency plan was met as of two actual external disasters of Hurricane Helene (9/24-9/27/24) and Hurricane Milton (10/7-10/11/24). 2. The Administrator and Maintenance Supervisor completed its analysis and documentation of the two natural disasters, Hurricanes Helene and Milton. 3. The Maintenance Supervisor was educated on 11/15/24 by the Administrator/VPO on testing requirements of the center's emergency plan at least twice a year, including community-based exercises, facility-based exercises, man-made natural disasters, mock disaster drills, or tabletop exercises. The Maintenance Supervisor was educated on 11/15/24 by the Administrator/VPO on analyzing the center's response to and maintaining documentation of all drills, tabletop exercises and emergency events, and revising the center's emergency plan as needed. 4. The Maintenance Supervisor will conduct exercises to test the center's emergency plan at least twice per year, and review results with QA&A Committee
10/23/2024 SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237 PREFIX TAG ID PREFIX TAG DEFICIENCY) COMPLETION DATE
E 039 Continued From page 10 E 039 for 3 months, and then as directed by the QA&A Committee thereafter.
35961011A
10/23/2024
SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237
K 000 | INITIAL COMMENTS | K 000 | |
An unannounced Fire & Life Safety relicensure survey was conducted on 10/23/2024 at Sarasota Point Rehabilitation Center, a skilled nursing facility in Sarasota, Florida.
This survey was completed in accordance with National Fire Protection Association (NFPA) 1 and 101 (2018 Edition) and applicable requirements of Florida State Fire Marshal's Rules and Regulations, Florida Administrative Code (F.A.C) 69A-3, F.A.C. 69A-53, F.A.C. 59A-4, and Florida Statutes (F.S.) 400 Part II, and F.S. 633.0215, adopting NFPA 1 and 101 (2018 Edition) known as the Florida Fire Prevention Code and all NFPA referenced standards and requirements adopted per NFPA 101, Chapter 2.
The following is a description of the deficiencies.
K 353 SS=F | NFPA 101 Sprinkler System - Maintenance and Testing | K 353 | | 11/24/24
Sprinkler System - Maintenance and Testing Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _______________
b) Who provided system test _______________________________
c) Water system supply source ______________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler
11/15/24
STATE FORM 6899 V94121
35961011A 10/23/2024 SARASOTA POINT REHABILITATION CENTER 2600 COURTLAND STREET SARASOTA, FL 34237 PREFIX TAG ID PREFIX TAG DEFICIENCY) COMPLETE DATE
K 353 Continued From page 1 system. 9.7.5, 9.7.7, 9.7.8, and NFPA 25
K 353 This Statute or Rule is not met as evidenced by:
Based on record review, observation and staff interview with the Maintenance Director, the facility failed to perform the required inspections of the automatic fire sprinkler system (AFSS) as required in NFPA 101. The findings included: On 10/23/24 between 10:00 a.m. and 11:00 a.m., during record review with the Maintenance Director, the facility failed to provide documentation of a 3rd quarter sprinkler system inspection. The previous 3rd quarter inspection was performed on 8/7/23. The Maintenance Director was interviewed, and he said he could not locate the documents. An interview was conducted with the Maintenance Director concurrent with the observations and acknowledged the findings. per NFPA 101 (2021 Edition) 9.11.1 per NFPA 25 (2020 Edition) table 5.1.1.2 Class III
K 900 NFPA 99 Health Care Facilities Code - Other SS=F Health Care Facilities Code - Other List in the REMARKS section any NFPA 99 requirements (including Chapter 7, 8, 12, and 13) that are not addressed by the provided K-Tags, but this information, along with the applicable Health Care Facilities Code or NFPA standard citation, should be included.
K 900 1. The center will perform the required inspections of the automatic fire sprinkler system as required by NFPA 101 by 11/24/2024. 2. All residents had the potential of being affected by the missed inspection. 3. The Maintenance Supervisor was educated on 11/15/24 by the Administrator/ VPO on maintenance and testing automatic sprinkler and standpipe systems in accordance with NFPA 25. 4. The maintenance supervisor will audit the center's inspection of the automatic fire sprinkler systems in accordance with NFPA 25 and review the results with QA&A Committee after each inspection for one year, and then as directed by the QA&A Committee thereafter. 11/24/24 STATE FORM ess V94121
SARASOTA POINT REHABILITATION CENTER
2600 COURTLAND STREET SARASOTA, FL 34237
|---|---|---|---|---| | K 900 | Continued From page 2 | K 900 | | | | | This Statute or Rule is not met as evidenced by: Based on observations, and staff interview with the Maintenance Director, the facility failed to ensure that Nurse Call equipment is maintained in accordance with National Fire Protection Association (NFPA) 99. Failure to maintain these systems could delay necessary care to residents. | | 1. An Inspection of the nurse call systems on Siesta, Lido and Longboat units was completed on 11/04/24 and the necessary repairs will be completed by 11/24/24 by Center State Electric. | | | | The findings included: | | 2. All residents had the potential of being affected by the nurse call systems not functioning properly. | | | | On 10/23/24 Between 11:00 a.m. and 3:30 p.m. while touring the facility with the Maintenance Director, the following was observed: | | 3. The maintenance supervisor and maintenance assistant were educated on 11/15/24 by the Administrator/VPO on periodic testing and maintaining the nurse call systems on each nursing unit in proper working order, including both audio and visual functions. | | | | 1. Lito nurse call base had no audio or visual functioning. 2 of the 3 zone lights did not function. | | 4. The Maintenance Supervisor and/or designee will conduct a weekly audit of the nurse call be systems for 8 weeks, then bi-weekly for 4 weeks, and then as directed by the QA&A Committee with results of these audits reported monthly to the QA&A Committee. | | | | 2. Longboat nurse call base had no functioning audio. 1 of the 3 zone lights did not function. | | | | | | 3. Siesta nurse call base had no functioning audio. 1 of the 3 zone lights did not function. | | | | | | An interview was conducted with the Maintenance Director concurrent with the observations and acknowledged the findings. | | | | | | Per NFPA 99 (2021 Edition) 7.3.3.1.1.1, 7.3.3.1.2.1 | | | | | | Class III | | | | | K 914 SS=F | NFPA 99 Electrical Systems - Maintenance and Testing | K 914 | | 11/24/24 | | | Electrical Systems - Maintenance and Testing Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by | | | |
STATE FORM
DEPARTMENT OF DEFICIENCIES 35961011A 10/23/2024
SARASOTA POINT REHABILITATION CENTER 2600 COURT LAND STREET SARASOTA, FL 34237
PREFIX REGULATORY OR LSC SPYING INFORMATION) | ID PREFIX COMPLETE DATE
K 914 | Continued From page 3 | K 914 | |
documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results. 6.3.4 (NFPA 99)
This Statute or Rule is not met as evidenced by:
Based on record review and staff interview with the Maintenance Director, it was revealed that the facility failed to ensure that all Essential and standard Electrical Equipment was inspected and maintained as required. Essential and Standard Electrical Equipment not inspected, tested, and maintained renders the equipment unreliable, and undetected faulty equipment could cause the safety features of the equipment to fail and raises potential for negative outcomes to patients and building occupants.
The findings included:
On 10/23/24 between 10:00 a.m. and 11:00 a.m., during record review with the Maintenance Director, documentation for the Main & Feeder Circuit Breaker inspection including periodic exercise in accordance with the manufacturer's recommendations could not be produced. An interview was conducted with the Maintenance Director concurrent with the observations and
1. The Center's main & feeder circuit breaker inspections were completed on 4/17/24 (minor and load bank) and 4/15/24 (breaker exercising) by LEW. 2. All residents had the potential of being affected by the missed inspection. 3. The Maintenance Supervisor was educated on 11/15/24 by the Administrator/ VPO on inspecting, testing and maintaining essential and standard electrical equipment in accordance with NFPA 101. 4. The maintenance supervisor will audit the center's inspection of the essential and standard electrical equipment in accordance with NFPA 99 testing requirements and review the results with QA&A Committee for one year, and as directed by the QA&A Committee
STATE FORM 699 V94121
SARASOTA POINT REHABILITATION CENTER
2600 COURTLAND STREET SARASOTA, FL 34237
K 914 | Continued From page 4 acknowledged the findings. Per NFPA 101 (2021 Edition) 19.5.1.1, 9.1.3.1 Per NFPA 99 (2021 Edition) 6.7.4.1.2, 6.7.4.2 Per NFPA 110 (2019 Edition) 8.4.7 Class III | K 914 | thereafter. |
K1053 SS=F | FAC 59A-4.126 Emergency Management Plan A written, comprehensive emergency management plan for emergency care during an internal or external disaster or emergency, which is reviewed and updated annually, shall be maintained. The health care facility shall test the implementation of the emergency management plan semiannually, either in response to a disaster or an emergency or in a planned drill, and shall evaluate and document the health care facility performance to the health care facility safety committee. Florida Administrative Code 59A-4.126.
This Statute or Rule is not met as evidenced by:
Based on record review and staff interview with the Administrator, the facility failed to provide evidence of an External and Internal Disaster drill with a documented staff participation.
The findings included: On 10/23/24 between 3:30 p.m. and 4:30 p.m., during record review with the Administrator, documentation for the external and Internal annual drills was produced. A Hurricane drill dated 8/29/23 and a Power failure drill dated | K1053 | 1. The center's required activation of its emergency plan was met as a result of two actual external disasters of Hurricane Helene (9/24-9/27/24) and Hurricane Milton (10/7-10/11/24). 2. The Administrator and Maintenance Supervisor completed its analysis and documentation of the two natural disasters, Hurricanes Helene and Milton. 3. The Maintenance Supervisor was | 11/24/24
STATE FORM
COMPLETED 10/23/2024
SARASOTA, FL 34237
PREFIX PREFIX COMPLETE DATE
K1053 Continued From page 5 K1053 educated on 11/15/24 by the Administrator/VPO of testing requirements of the center's emergency plan at least twice a year, including community-based exercises, facility-based exercises, man-made natural disasters, mock disaster drills, or tabletop exercises. The Maintenance Supervisor was educated on 11/15/24 by the Administrator/VPO on analyzing the center's response to and maintaining documentation of all drills, tabletop exercises and emergency events, and revising the center's emergency plan as needed. 4. The Maintenance Supervisor will conduct exercises to test the center's emergency plan at least twice per year, and review results with QA&A Committee for 3 months, and then as directed by the QA&A Committee thereafter.
6/30/23 was submitted for review. The facility failed to acquire signed staff participation forms for the hurricane drill. Drills for the 2024 year had not been completed. An interview conducted with the Administrator concurrent with the observations and acknowledged the findings.
Florida Administrative Code 59A-4.126 Class III
K1150 NFPA 99 (2015 Edition) Security Management SS=F This chapter shall apply to new and existing health care facilities. A health care facility shall have a security management plan. The scope, objectives, performance, and effectiveness of the security plan shall be tested by a frequency shown to be necessary by review of the security vulnerability assessment (SVA) in accordance with Section 13.3. NFPA 99 (2015 Edition)
This Statute or Rule is not met as evidenced by:
Based on record review and staff interview with the Administrator, the facility failed to provide evidence of their annual Security vulnerability
K1150 1. The Administrator & Maintenance Supervisor updated and revised the Security Management Plan on 10/31/24 11/24/24
STATE FORM esss V94121
35961011A 10/23/2024 2600 COURTLAND STREET SARASOTA, FL 34237 PREFIX PREFIX COMPLETE DATE
K1150 Continued From page 6 assessment in accordance with NFPA 99. The findings included: On 10/23/24 between 3:30 p.m. and 4:30 p.m., during record review with the Administrator, the facility failed to provide evidence of their Security Management Plan with an annual security vulnerability assessment. An interview was conducted with the Administrator concurrent with the observations and acknowledged the findings. Per NFPA 99 (2021 Edition) 13.3.1 Class III K1150 and completed the annual Security Vulnerability Assessment (SVA) on 11/01/24. 2. All residents had the potential of being affected by not having a proper Security Management Plan or SVA. 3. The maintenance supervisor was educated on updating and revising the Security Management Plan and completing the annual Security Vulnerability Assessment on 11/15/24 by the Administrator/VPO. 4. The maintenance supervisor will audit annually to ensure the center’s Security Management Plan is updated and the Security Vulnerability Assessment has been completed and review the results with QA&A Committee annually.