Skip to main content

Inspection visit

Fire Safety inspection

Manzano Del Sol by PurehealthCMS #32507432 citations on this visit
32 citations recorded

Citations

32 citations recorded*CMS

This is a Fire Safety survey. CMS cites these findings under the Life Safety Code and Emergency Preparedness rules, a separate set from the health (F-tag) deficiencies. The codes and grading differ, so these do not link to the health violation pages.

What do CMS severity letters mean?

Serious (G-L). Actual harm to a resident, or immediate jeopardy. Codes G through I indicate actual harm; J through L indicate immediate jeopardy to resident health or safety.

General (A-F). No actual harm found, or harm that is minimal. The facility must still submit a Plan of Correction. Most CMS citations land here.

Each letter combines severity with scope: how many residents the deficiency affected.

  • 0293GeneralS&S Epotential for harm

    Have properly located and lighted "Exit" signs.

  • 0100GeneralS&S Fpotential for harm

    Meet other general requirements.

  • 0006GeneralS&S Fpotential for harm

    Conduct risk assessment and an All-Hazards approach.

  • 0009GeneralS&S Fpotential for harm

    Include a process for Emergency Preparedness collaboration.

  • 0020GeneralS&S Fpotential for harm

    Establish policies and procedures including evacuation.

  • 0030GeneralS&S Fpotential for harm

    List the names and contact information of those in the facility.

  • 0031GeneralS&S Fpotential for harm

    Provide emergency officials' contact information.

  • 0037GeneralS&S Fpotential for harm

    Establish staff and initial training requirements.

  • 0039GeneralS&S Fpotential for harm

    Conduct testing and exercise requirements.

  • 0222GeneralS&S Epotential for harm

    Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.

  • 0223GeneralS&S Epotential for harm

    Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.

  • 0291GeneralS&S Fpotential for harm

    Install emergency lighting that can last at least 1 1/2 hours.

  • 0321GeneralS&S Epotential for harm

    Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.

  • 0345GeneralS&S Fpotential for harm

    Have approved installation, maintenance and testing program for fire alarm systems.

  • 0346GeneralS&S Fpotential for harm

    Follow proper procedures when the fire alarm was out of service for more than 4 hours.

  • 0351GeneralS&S Epotential for harm

    Install an approved automatic sprinkler system.

  • 0353GeneralS&S Fpotential for harm

    Inspect, test, and maintain automatic sprinkler systems.

  • 0354GeneralS&S Fpotential for harm

    Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.

  • 0355GeneralS&S Dpotential for harm

    Properly select, install, inspect, or maintain portable fire extinguishes.

  • 0363GeneralS&S Epotential for harm

    Install corridor and hallway doors that block smoke.

  • 0372GeneralS&S Epotential for harm

    Ensure smoke barriers are constructed to a 1 hour fire resistance rating.

  • 0374GeneralS&S Epotential for harm

    Install smoke barrier doors that can resist smoke for at least 20 minutes.

  • 0531GeneralS&S Fpotential for harm

    Have elevators that firefighters can control in the event of a fire.

  • 0712GeneralS&S Fpotential for harm

    Have simulated fire drills held at unexpected times.

  • 0761GeneralS&S Epotential for harm

    To conduct inspection, testing and maintenance of fire doors by qualified individuals.

  • 0781GeneralS&S Epotential for harm

    Have restrictions on the use of portable space heaters.

  • 0911GeneralS&S Epotential for harm

    Meet requirements for the installation and maintenance of electrical systems.

  • 0918GeneralS&S Fpotential for harm

    Have generator or other power source capable of supplying service within 10 seconds.

  • 0920GeneralS&S Epotential for harm

    Ensure proper usage of power strips and extension cords.

  • 0923GeneralS&S Epotential for harm

    Have proper medical gas storage and administration areas.

  • 0926GeneralS&S Fpotential for harm

    Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.

  • 0004GeneralS&S Fpotential for harm

    Develop and maintain an Emergency Preparedness Program (EP).

FAQ · About this visit

Common questions about this visit

What happened during the August 11, 2025 survey of Manzano Del Sol by Purehealth?

This was a inspection survey of Manzano Del Sol by Purehealth on August 11, 2025. The surveyor cited 32 deficiencies, recorded on the federal Form 2567 statement of deficiencies.

Were any deficiencies cited at Manzano Del Sol by Purehealth on August 11, 2025?

Yes, 32 deficiencies were cited, each with a CMS Scope and Severity grade. The first was: "Have properly located and lighted "Exit" signs."

What type of survey was this?

This was a inspection survey conducted by state surveyors under federal Centers for Medicare & Medicaid Services (CMS) oversight. Findings are published on CMS Care Compare.

Share this reportEmail

Next steps

Concerned about a resident’s care?Find your local ombudsman through the Eldercare Locatoror file a complaint with your state survey agency.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CMS Care Compare public records. Dataset last refreshed . If you believe any information is inaccurate, report it here.