Skip to main content

Inspection visit

Inspection

EL RENO POST-ACUTE REHABILITATION CENTERCMS #3754487 citations on this visit
7 citations recorded

Citations

7 citations recorded*CMS

What do CMS severity letters mean?

Serious (G-L). Actual harm to a resident, or immediate jeopardy. Codes G through I indicate actual harm; J through L indicate immediate jeopardy to resident health or safety.

General (A-F). No actual harm found, or harm that is minimal. The facility must still submit a Plan of Correction. Most CMS citations land here.

Each letter combines severity with scope: how many residents the deficiency affected.

  • 0637GeneralS&S Dpotential for harm

    F637 - Within 14 days after the facility determines, or should have determined,

    Assess the resident when there is a significant change in condition

  • 0641GeneralS&S Dpotential for harm

    F641 - Accuracy of Assessments

    Ensure each resident receives an accurate assessment.

  • 0755GeneralS&S Epotential for harm

    F755 - Pharmacy Services

    Provide pharmaceutical services to meet the needs of each resident and employ or obtain the services of a licensed pharmacist.

  • 0770GeneralS&S Epotential for harm

    F770 - Laboratory Services

    Provide timely, quality laboratory services/tests to meet the needs of residents.

  • 0271GeneralS&S Epotential for harm

    Have exits that are accessible at all times.

  • 0321GeneralS&S Fpotential for harm

    Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.

  • 0372GeneralS&S Fpotential for harm

    Ensure smoke barriers are constructed to a 1 hour fire resistance rating.

FAQ · About this visit

Common questions about this visit

What happened during the April 3, 2023 survey of EL RENO POST-ACUTE REHABILITATION CENTER?

This was a inspection survey of EL RENO POST-ACUTE REHABILITATION CENTER on April 3, 2023. The surveyor cited 7 deficiencies, recorded on the federal Form 2567 statement of deficiencies.

Were any deficiencies cited at EL RENO POST-ACUTE REHABILITATION CENTER on April 3, 2023?

Yes, 7 deficiencies were cited, each with a CMS Scope and Severity grade. The first was: "Assess the resident when there is a significant change in condition"

What type of survey was this?

This was a inspection survey conducted by state surveyors under federal Centers for Medicare & Medicaid Services (CMS) oversight. Findings are published on CMS Care Compare.

Share this reportEmail

Next steps

Concerned about a resident’s care?Find your local ombudsman through the Eldercare Locatoror file a complaint with your state survey agency.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CMS Care Compare public records. Dataset last refreshed . If you believe any information is inaccurate, report it here.