Skip to main content

Inspection visit

Inspection

MIRABELLA SEATTLECMS #50552036 citations on this visit
36 citations recorded

Citations

36 citations recorded*CMS

What do CMS severity letters mean?

Serious (G-L). Actual harm to a resident, or immediate jeopardy. Codes G through I indicate actual harm; J through L indicate immediate jeopardy to resident health or safety.

General (A-F). No actual harm found, or harm that is minimal. The facility must still submit a Plan of Correction. Most CMS citations land here.

Each letter combines severity with scope: how many residents the deficiency affected.

  • 0684GeneralS&S Dpotential for harm

    F684 - Quality of care

    Provide appropriate treatment and care according to orders, resident’s preferences and goals.

  • 0695GeneralS&S Dpotential for harm

    F695 - Respiratory care, including tracheostomy care and tracheal suctioning

    Provide safe and appropriate respiratory care for a resident when needed.

  • 0700GeneralS&S Dpotential for harm

    F700 - Bed Rails

    Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.

  • 0757GeneralS&S Dpotential for harm

    F757 - Unnecessary Drugs—General

    Ensure each resident’s drug regimen must be free from unnecessary drugs.

  • 0812GeneralS&S Epotential for harm

    F812 - Food safety requirements

    Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards.

  • 0550GeneralS&S Dpotential for harm

    F550 - Resident Rights

    Honor the resident's right to a dignified existence, self-determination, communication, and to exercise his or her rights.

  • 0552GeneralS&S Dpotential for harm

    F552 - Planning and Implementing Care

    Ensure that residents are fully informed and understand their health status, care and treatments.

  • 0637GeneralS&S Dpotential for harm

    F637 - Within 14 days after the facility determines, or should have determined,

    Assess the resident when there is a significant change in condition

  • 0641GeneralS&S Dpotential for harm

    F641 - Accuracy of Assessments

    Ensure each resident receives an accurate assessment.

  • 0655GeneralS&S Dpotential for harm

    F655 - Comprehensive Person-Centered Care Planning

    Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted

  • 0656GeneralS&S Dpotential for harm

    F656 - Comprehensive Care Plans

    Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured.

  • 0758GeneralS&S Dpotential for harm

    F758 - Medication Errors

    Implement gradual dose reductions(GDR) and non-pharmacological interventions, unless contraindicated, prior to initiating or instead of continuing psychotropic medication; and PRN orders for psychotropic medications are only used when the medication is necessary and PRN use is limited.

  • 0001GeneralS&S Fpotential for harm

    Establish an Emergency Preparedness Program (EP).

  • 0004GeneralS&S Fpotential for harm

    Develop and maintain an Emergency Preparedness Program (EP).

  • 0006GeneralS&S Fpotential for harm

    Conduct risk assessment and an All-Hazards approach.

  • 0009GeneralS&S Fpotential for harm

    Include a process for Emergency Preparedness collaboration.

  • 0015GeneralS&S Fpotential for harm

    Address subsistence needs for staff and patients.

  • 0025GeneralS&S Fpotential for harm

    Create arrangements with other facilities to receive patients.

  • 0031GeneralS&S Fpotential for harm

    Provide emergency officials' contact information.

  • 0037GeneralS&S Fpotential for harm

    Establish staff and initial training requirements.

  • 0324GeneralS&S Fpotential for harm

    Provide properly protected cooking facilities.

  • 0341GeneralS&S Fpotential for harm

    Install a fire alarm system that can be heard throughout the facility.

  • 0345GeneralS&S Fpotential for harm

    Have approved installation, maintenance and testing program for fire alarm systems.

  • 0353GeneralS&S Fpotential for harm

    Inspect, test, and maintain automatic sprinkler systems.

  • 0355GeneralS&S Fpotential for harm

    Properly select, install, inspect, or maintain portable fire extinguishes.

  • 0926GeneralS&S Fpotential for harm

    F926 - Establish policies, in accordance with applicable Federal, State, and

    Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.

  • 0039GeneralS&S Fpotential for harm

    Conduct testing and exercise requirements.

  • 0222GeneralS&S Fpotential for harm

    Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.

  • 0291GeneralS&S Fpotential for harm

    Install emergency lighting that can last at least 1 1/2 hours.

  • 0321GeneralS&S Dpotential for harm

    Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.

  • 0374GeneralS&S Fpotential for harm

    Install smoke barrier doors that can resist smoke for at least 20 minutes.

  • 0521GeneralS&S Fpotential for harm

    Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.

  • 0531GeneralS&S Fpotential for harm

    Have elevators that firefighters can control in the event of a fire.

  • 0541GeneralS&S Fpotential for harm

    Install properly constructed and protected linen or trash chutes.

  • 0761GeneralS&S Fpotential for harm

    F761 - Labeling of Drugs and Biologicals

    To conduct inspection, testing and maintenance of fire doors by qualified individuals.

  • 0921GeneralS&S Fpotential for harm

    F921 - Other Environmental Conditions

    Ensure that testing and maintenance of electrical equipment is performed.

FAQ · About this visit

Common questions about this visit

What happened during the March 22, 2023 survey of MIRABELLA SEATTLE?

This was a inspection survey of MIRABELLA SEATTLE on March 22, 2023. The surveyor cited 36 deficiencies, recorded on the federal Form 2567 statement of deficiencies.

Were any deficiencies cited at MIRABELLA SEATTLE on March 22, 2023?

Yes, 36 deficiencies were cited, each with a CMS Scope and Severity grade. The first was: "Provide appropriate treatment and care according to orders, resident’s preferences and goals."

What type of survey was this?

This was a inspection survey conducted by state surveyors under federal Centers for Medicare & Medicaid Services (CMS) oversight. Findings are published on CMS Care Compare.

Share this reportEmail

Next steps

Concerned about a resident’s care?Find your local ombudsman through the Eldercare Locatoror file a complaint with your state survey agency.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CMS Care Compare public records. Dataset last refreshed . If you believe any information is inaccurate, report it here.