Skip to main content

Inspection visit

Fire Safety inspection

Raleigh CenterCMS #51508811 citations on this visit
11 citations recorded

Citations

11 citations recorded*CMS

This is a Fire Safety survey. CMS cites these findings under the Life Safety Code and Emergency Preparedness rules, a separate set from the health (F-tag) deficiencies. The codes and grading differ, so these do not link to the health violation pages.

What do CMS severity letters mean?

Serious (G-L). Actual harm to a resident, or immediate jeopardy. Codes G through I indicate actual harm; J through L indicate immediate jeopardy to resident health or safety.

General (A-F). No actual harm found, or harm that is minimal. The facility must still submit a Plan of Correction. Most CMS citations land here.

Each letter combines severity with scope: how many residents the deficiency affected.

  • 0355GeneralS&S Fpotential for harm

    Properly select, install, inspect, or maintain portable fire extinguishes.

  • 0363GeneralS&S Cno actual harm

    Install corridor and hallway doors that block smoke.

  • 0761GeneralS&S Fpotential for harm

    To conduct inspection, testing and maintenance of fire doors by qualified individuals.

  • 0914GeneralS&S Fpotential for harm

    Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.

  • 0341GeneralS&S Fpotential for harm

    Install a fire alarm system that can be heard throughout the facility.

  • 0351GeneralS&S Cno actual harm

    Install an approved automatic sprinkler system.

  • 0923GeneralS&S Fpotential for harm

    Have proper medical gas storage and administration areas.

  • 0006GeneralS&S Cno actual harm

    Conduct risk assessment and an All-Hazards approach.

  • 0324GeneralS&S Dpotential for harm

    Provide properly protected cooking facilities.

  • 0918GeneralS&S Fpotential for harm

    Have generator or other power source capable of supplying service within 10 seconds.

  • 0353GeneralS&S Fpotential for harm

    Inspect, test, and maintain automatic sprinkler systems.

FAQ · About this visit

Common questions about this visit

What happened during the August 29, 2024 survey of Raleigh Center?

This was a inspection survey of Raleigh Center on August 29, 2024. The surveyor cited 11 deficiencies, recorded on the federal Form 2567 statement of deficiencies.

Were any deficiencies cited at Raleigh Center on August 29, 2024?

Yes, 11 deficiencies were cited, each with a CMS Scope and Severity grade. The first was: "Properly select, install, inspect, or maintain portable fire extinguishes."

What type of survey was this?

This was a inspection survey conducted by state surveyors under federal Centers for Medicare & Medicaid Services (CMS) oversight. Findings are published on CMS Care Compare.

Share this reportEmail

Next steps

Concerned about a resident’s care?Find your local ombudsman through the Eldercare Locatoror file a complaint with your state survey agency.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CMS Care Compare public records. Dataset last refreshed . If you believe any information is inaccurate, report it here.