Skip to main content

Inspection visit

Facility-requested visit

Clean visit · 0 citations

Inspector’s narrative

What the inspector wrote

On 05/10/21 at 9am, Licensing Program Manager (LPM) Mayla Mendoza and Licensing Program Analyst (LPAs) Melissa Domantay and Melissa Guirit arrived at the facility for an announced case management inspection. LPA met with Mirza Kopelman, the assistant director . The normal hours of operation are Monday-Friday 7:30am-6pm. An application was received to add one additional classroom. There are no changes to the capacity or other classrooms, bathrooms and outdoor space that were previously licensed. The currently licensed classrooms are A, B,C, D, nap room 1 and 2, and Room 1 (Located at 1009 Heinz). The new classroom is Room 3 (The Kindergarten room) will also be used for the preschool component. LPM and LPAs toured the new classroom to conduct a health and safety inspection, and completed the following measurements: INDOORS: 4,708.76 square feet = 134 children OUTDOORS: 4,600 square feet = 61 children All other indoor and outdoor measurements remain the same. A fire clearance was received from the Berkeley Fire Department on 04/16/21. LPM and LPAs observed that there is sufficient heating, lighting and ventilation in the classrooms, and the classroom floors and surfaces are clean and free of hazards. The rooms have an ample supply of age appropriate furniture, toys and equipment which appear to be in good condition. LPM and LPAs did not observe any bodies of water, hazardous items or toxins that would be accessible to children. LPM and LPAs observed an operating sink in each room and covered waste cans. The rooms are equipped with fully charged 2A10BC fire extinguishers, carbon monoxide detectors and centralized smoke detection systems. The facility has a working telephone and first aid supplies. The new classroom will be made part of the license, effective today 05/10/21, and can be used when the facility is ready. There are no deficiencies being cited today. This report will remain on file for 3 years. A Notice of Site inspection was provided to the assistant director, and an exit interview was conducted.

Citations

No citations recorded on this visit

The inspector found no violations of California child care regulations during this visit.

FAQ · About this visit

Common questions about this visit

What happened during the May 10, 2021 inspection of ECOLE BILINGUE DE BERKELEY PRESCHOOL?

This was an other inspection of ECOLE BILINGUE DE BERKELEY PRESCHOOL on May 10, 2021. The inspection found no deficiencies and no citations were issued.

Were any citations issued to ECOLE BILINGUE DE BERKELEY PRESCHOOL on May 10, 2021?

No citations were issued during this inspection. The facility was found to be in compliance with all applicable regulations.

What type of inspection was this?

This was an other inspection. other inspections are conducted by CCLD as part of their licensing oversight.

Share this reportEmail

Next steps

If this is your facility,claim this pageand correct anything the record gets wrong. Free.

Researching this visit professionally?Book a 15-minute calland we will walk through what we have on file.

Data from CCLD public records. Last updated . If you believe any information is inaccurate, report it here.